Pre-War buildings

The simplified rebuilding of a flat with a confirmation card

Characteristics


Pre-war buildings have been built in the period till the World War II. They were built mainly with the following materials: dolomitic rocks, boulders and clay bricks. Ceiling height is from over 2.5m up to 3.7m.

Apartments, which are not transformed, mainly in host homes often have two entrances (formerly one entrance was used by apartment owners and the other by servants). The buildings are up to six storeys high. Pre-war building room spaces are large with the exception of daughter (servants) rooms which are small.


Overall characteristics: dolomitic rocks, boulders and clay bricks
Loggia: no
Balcony: yes
Floors: 2 to 6
Floor height: 2.5m to 3.7m
Lift: no
Waste pipe: no


Send by email or using whatsapp:

(documents for evaluation)


  • Land Register and inventory file (cadastral survey file)

  • Description or sketch of the alteration to be carried out, photos of the room walls and ceilings

  • Submit by email, WhatsApp, or in the office, receive approval and invoice

  • Possible additional expenses to the project: building work insurance, building permit fee, etc. post factum

Get your ready-to-use project:

(starting from 1 business day)


  • Consultations by phone, WhatsApp, or email

  • 24/7 access to project files

  • Service also available outside Latvia (remotely)

After approval from the building authority:

(up to 10 business days)


  • Complete the construction works within five years

  • Easy commissioning in BIS system

  • Consultations with BIS, the building authority, and us

Project costs:


  • For standard apartments across Latvia - 249 EUR
  • For apartments in special projects across Latvia - 299 EUR
  • For pre-war apartments across Latvia - from 349 EUR
  • For apartments in new projects across Latvia - from 399 EUR

Project composition:


  • Notification filled out in BIS system
  • Room plan with modifications drawn up
  • Explanatory description of the project proposal
  • Approval by a certified building professional
  • Obtaining building authority’s approval in BIS

Additional services:

(as required)


  • Simplified certification by an architect from EUR 50
  • Survey by a structural engineer from EUR 150
  • Technical study report from EUR 250
  • Diagram for reconstruction of engineering networks from EUR 150
  • Cultural and historical inventory from EUR 250